Wednesday, June 5, 2019

Industrialized Building System (IBS) | Literature Review

Industrialized create System (IBS) Literature ReviewCHAPTER 2LITERATURE REVIEW2.1 IntroductionThe objectives of this chapter leave behind identify and study into the details and provide the literature review of Industrialized Building System (IBS). In this literature review of building trunk depart also be covered in this chapter. The contents go forth focus on definitions of IBS, characteristic of building in Malaysia with application of IBS, advantages of IBS and disadvantages of IBS. The 5 types of widely utilize IBS in Malaysia trade union movement will be study in this chapter. In addition, the comparison of suggestion order which theatrical role of IBS in different building in Malaysia will be carried out in this chapter. Besides that, the ashesatic solution by applying IBS in current Malaysia projects which able to reduce waste during structure project life cycle which able to create and heading toward friendly or eco environment compare to customary method will be carried out in this chapter.2.1.1 Definition of IBSAccording to Dietz (1971), in the early literature defined IBS as the whole procedure of all the sub corpses and components make full utilized of industrial production, trance and assembly technology. The IBS system is actually apply in social organization industry is mainly to reduce input and generate more output by maximize or fully utilized the production, transportation and assembly during construction stage which indirectly save up a crew of time and costs for the process of above. (Dietz 1971)Meanwhile gibe Warszawski (1999), IBS defined as a set of interrelated elements, to take collective action that the designated and performance of the building. In additional, IBS is defined as a process of investment in facilities, technology and equipment, to minimize the amount of labour in the turn up, to improve the tint of building and to increase the speed of construction. From here we find that not only time and cost is b eing save up but indeed quality also can be improve by applying IBS. (Warszawski 1999).According to Parid (1997), IBS defined as a industrialized production technology used by the system, whether in component production or assembly of building. (Parid 1997)The indication from Esa et al (1998), IBS as continuous use of the system, so that the manufacturing use end-user to reduce waste of resources and enhance the value of each building craftsmen. (Esa etal 1998)According to CIDB, IBS is a construction process that transferring the substantial activities from localize to mill where the building components are manufacture in pulverization then delivery to site and assembled at site. This is the process that bring prefabricated the elements of building in factory by using machine or formwork and on-site installation.2.1.2 Classification of IBSIn early stages, Badir (1998) proposed four types in Malaysia with Badir-Razali classification. These building systems which is received sys tem, cast in situ system, composite building system and the prefabricated system is shown in Figure 2.1. Each building system is composed of representatives of the respective construction methods, gum olibanum further through its construction characteristics of the technology, features and geometry. (Badir 1998)Figure 2.1 Types of building system according to Badir-Razali classification in Malaysia (Badir 1998)IBS also can be classified according to some(prenominal) aspectsAccording to structural systemAccording to materialAccording to congener weight of component2.1.3 Classification according to structural systemPanel systemThe loads are distributes by the large floor and wall panel where the building loads is support by wall in panel system. This system is suitable for those building are required large wall and this system is not suitable to building with large span.Frame systemIn look system, the building loads are support by column and beam. The walls used is required ligh t and easy to fix and concrete panels are introduces as base element.Box systemThe box systems is include those systems that make use of three-dimensional modules or boxes for fabrication of habitable units that are able of with resisting load from various directions over collectable to their internal stability.2.1.4 Classification according to materialTimberThe prefabrication of timber consists of two types which are ready-cut plus shop fabrication of joints (column and beam) and structural panels only consists of walls and floors without column and beam.bladeAll the steel elements are prefabricated in factory then only transport to site to joints by welding or bolting at site. The large correspondence of the strength to the weight al clinical depressions a long-span or high-rise building.Reinforced concreteReinforced concrete has high degree of availability, durability, beginning material cost and go off resistance. There are two basic trends in development of reinforced conc rete IBS components which are formed regorge members such as columns and beams and panelised components such as walls and floors.Brick and blockBrick and block for IBS are prefabricate and lay in factory then only transported to site and last erected at site. With this will ease the construction works at site.2.1.5 Classification according to relative weight of componentIBS components can be classified according to relative weight. Majzub explained that the relative weight of components should be used as a basis for building classification because the factor of weight has significant impact on the transportability of components and has influence on the production method of the components and their erection method at site. Table 1 is shown the building systems classification according to relative weight of component. (Majzub, 1977)Table 1 Classification according to relative weight of components (Majzub, 1977)2.1.6 Types of IBS and apply to building in MalaysiaBased on CIDB (2003) the classification of IBS in Malaysia is broken down into five categories, which is a precast concrete frame panel and box system, steel formwork system, steel material body system, block work system and timber frame system . IBS is a construction process that use of technology, products, components and on-site installation of building system. From the structural classification five of IBS display section, which are mainly classified according to some modifications, the main groups in Malaysia by CIDB. (CIDB 2003)2.1.6.1 Precast Concrete Framing, Panel and box systemPrecast concrete components are the most common prefabricated elements in Malaysia. The precast concrete elements are the concrete product that manufactured in a controlled environment and being transported to the construction site for installation. There are precast concrete for columns, slabs, lightweight precast concrete, fixed concrete formwork, and beams. Besides that, it also consists of 3-D components such as s taircases, toilet, balconies, lift chamber and etc.High degree of tractability is one of the advantages of the system in regards of larger of larger clear span between column, resulting in wider open space and freedom of greater areas.Precast concrete wall system consisting og precast floor and load-bearing walls of building. The load-bearing walls and slabs are transfer to construction site for erected. The system is preferred elemental and easy flexibility with due to the restriction of removal of load bearing will making it a lesser degree of flexibility. The carefully good coordination and design between builders and designer, the erection process is very fast, and the number of wet trade in the field can be reduced significantly.2.1.6.2 brand name Formwork SystemsThis is the system formwork which is designed by manufacturer to replace a conventional timber formwork. The steel formwork is manufactured in the plant and then assembled on construction site. The steel reinforcem ent and service conduit will be installed on site before the steel formworks are installed. the installation is very easy by using simple support system. It can be described as a mould which the wet concrete can be poured into the mould and form the required shape, these steel formwork systems are subjected to quality control.This type of IBS method is considered as the low level in the construction industry. The steel formwork system that used in beams, permanent steel formworks, tunnel forms and column moulding forms.2.1.6.3 brace Framing SystemsSteel is a strong rigid materials, suitable for a high degree of flexibility across the structure of long term construction and rehabilitation of the architectural details of the framework construction. The components of steel framing system are rolled into standardized sizes. The component are then manufactured which involves cutting, drilling, shot blasting, welding and painting.Steel frames are erected, welding and the tightening of bo lt after they are fabricated. The steel framing systems has been a popular choice, and is widely used in fast star construction project, the system commonly used with precast concrete slab, steel columns and beams.2.1.6.4 Prefabricated Timber Framing SystemIn the early 1970s, single storey low cost terrace houses mostly built of pure timber frame and wood which sitting on three feet high plastered brick walls and taking advantages of simple raft foundation due to the high weight superstructure. These prefabricated timber framing systems is using the timber in the construction industry for the building. Usually the timber framing system are consists of timber building frames and timber roof trusses. Steel plate is being used during prefabrication of timber to join members of truss. All members needs to be treated with anti pest chemical.2.1.6.5 Block Work SystemsThe time consuming traditional brick laying tasks are generally simplified by using block work systems. Interlocking concr ete masonry units (CMU) and lightweight concrete blocks are involved in block work system. Fabricated and cured of the components take place in the plant. The elements are normally used as bricks in structures and interlocking concrete block pavement2.1.7 Advantages of IBS for public housingThere are many advantages of implementing IBS. according to CIDB (2003), compares to conventional method. Following are brief renderings on a number of advantages where using IBS for the public housing-AdvantagesDescriptionReduce construction timeIBS will requires less construction timeBecause both the site work and the fabrication of element can take place concurrently work at site only the erection of IBS components.So, this leads to earlier occupation of the building.Save costReducing on-site workers significantly labor cost for contractors. (Wisam 2005).Minimizing cost of transferring waste materials due to quality control and reducing waste material. (Noraini 2009).Exemption of the facial expression Levy for housing developers who utilize IBS components exceeding than 70%. (CIDB 2005).Provides earlier occupation of the building, thus reducing pertain payment or capital outlays (Peng, 1986 cited in Mian, A.T.E, 2006).Saving in labourBecause the IBS components are produced in factory and higher degree of using machine so will reduce of labour dependency of labour and cut down the cost of labour.According to Abraham Warszawski(1999), the labour savings in prefabricated elements may amount to to the highest degree 80% of their conventional requirement.So, will reduced the total foreign workers need in the construction industry.Optimized use of materialsHigher degree of precision and accuracy in the production can be achieve by using machine to produce IBS components and consequently reduce material wastage.So, the wastage at site will be reduced if using the IBS.High quality and better finishesQuality control is an ever-increasing requirement in all construction.Contro lled environment in factor, superior material excerpt and high mechanized technology lead to high quality controlled products. (Din 1984).High aesthetic end products through the processes of controlled prefabrication and simplified installations has maintained and ensured the quality of work in the construction industry (CIDB-(2), 2003 cited in Mian, A.T.E, 2006).Better quality control since production in factory is under heltered environment.Better quality will reduce the guardianship expenses because prefabricated components require less repair and preventive maintenance.Construction operation less affected by weatherThe fabrication of IBS components will not be accomplished by climate changes it is done in factory and only erection of the components take place on siteFaster project completion due to rapid progress under all weather construction.FlexibilityDifferent systems may use different prefabrication construction methods.IBS will provide more flexibility in the deign of p recast element.By the flexibility in Architectural design (Warszawski, 1999).Increase site safety and neatnessThis method neater and safer site stipulate can be obtain thru this method.Promote safe and systematic factory working environment as minimal workers, materials and construction waste is requires on site. (CIDB 2003).Construction process can be less thru using IBS components especially for the wet work at site.2.1.8 Disadvantages of IBS for public HousingAlthough there are a lot of advantages of IBS, however there are limitations for this system to be use too. Nothing in this world is perfect, so as using IBS. disadvantages of IBS are as follows-DisadvantagesdescriptionHigh initial capital costThe initial capital cost of IBS is usually higher than conventional method.The initial cost is includes the casting beds, cost of constructing the factory and support machinery.This method only can be achieved when undertaking large demand for housing project.Problem of jointsThese me thods are very sensitive to the errors and sloppy work. peeing leakage between joints is oft the major problem when IBS is being used.This problem is clearer in Malaysia where raining occur rapidly throughout the year.Sophisticated plants and skilled operatorsThe prefabrication system relies heavily on sophisticated plant, when skilled operators are required to the fabrication process coordinate and maintain.The entire project would be on a stand still if any of the section breakdown.Site accessibilityOne of the most important factors of the implementation of IBS is the site accessibility.IBS requires sufficient site accessibility to transport IBS components from factory to the site.According to Warszawski (1999), the transportations cost of prefabricated elements from plant to their construction site, amount to 3% to 5% of their total cost for distances not exceeding 50kn to 100km.Large working areaBuilding construction using IBS required a large working area for the tower crane, factory, storage and trailers for the IBS components.Most construction in order areas are often congested and fail to provide the area required.

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.